F35 LOLA IMPROVEMENTS

Nellis Air Force Base, Nevada

The project consisted of providing new support structures for the new F35A being introduced to Nellis Air Force Base. The improvements consisted of a Live Ordnance Loading Area (LOLA); areas for F35As as well as A-10s; overhead shade structures; a 14,300 sf LOLA Crew Operations Facility; a parking lot; access road improvements; and drainage/landscape in accordance with Anti-terrorism Force Protection (AT/FP) standards.

WERK | urban design also provided all of the associated 3D modeling for the project. Consideration went into providing a natural look for the drainage basins located around the facility and adjacent parking lot.

©2021 WERK | urban design. All Rights Reserved.